A Prime road job in Melbourne: a roller compacting fresh asphalt while the crew rakes it against a new concrete kerb

A Prime road job, Melbourne. Image created from a Prime job photograph.

Big commercial and insurance jobs

Construction and project management from the ground up, across Melbourne.

Patrick Messina’s team takes on concreting, asphalting, demolition and insurance work on commercial and industrial sites, high-end developments and unit sites, as one complete job from start to finish.

Start your project View our work

1,000+builds delivered across Melbourne

4.87★★★★★ average star rating

1team and one point of contact, start to finish

A concrete ground slab shown as separate layers: clay subgrade, crushed rock, vapour barrier, steel mesh on bar chairs, edge formwork and the concrete slab

What sits under a concrete slab

Built in six layers.

  1. 01Compacted subgradeThe natural ground, trimmed and compacted.
  2. 02Crushed rock baseA graded rock layer that spreads the load.
  3. 03Vapour barrierA membrane that keeps ground moisture out of the slab.
  4. 04ReinforcementSteel mesh lifted on bar chairs to sit inside the concrete.
  5. 05Edge formworkBoards that set the slab’s edge and height.
  6. 06Concrete slabPoured, levelled and finished.

Illustration: a typical slab build-up, not a project specification.

How Prime works

One team and one point of contact, from the first site visit to the day the job is handed over.

Every job, built in stages.

  1. From above, looking down the length of a roofless, burnt-out factory shell, with an excavator working among the debris

    1Site, read.

    Site walk

    Every job starts on site. The team walks it and works out what stays, what goes and in what order.

    See the factory job

    Factory rebuild, Melbourne’s north. Image created from a still of Prime’s project film.

  2. An excavator pulling down the fire-damaged wall of the factory, with twisted roof sheeting piled below

    2Ground, cleared.

    Demolition

    Damaged structure comes down safely. Steel is cut, sorted and cleared so the site is ready for what comes next.

    See the demolition

    Demolition at the factory rebuild. Still from Prime’s project film, digitally enhanced.

  3. Prime crew trenching beside a new concrete path, with an excavator bucket resting in the trench

    3Earth, shaped.

    Excavation

    Site preparation, trenching and land shaping with modern earthmoving equipment, dug to line and level.

    Civil and groundworks

    Trenching beside a new path. Image created from a Prime job photograph.

  4. Crew in high-visibility clothing guiding concrete down the chute of an agitator truck during a pour

    4Base, poured.

    Concrete

    Slabs, footings and footpaths, placed accurately and finished properly so they last.

    Concrete and structures

    A pour under way. Image created from a Prime job photograph.

  5. Crew raking fresh asphalt against a new concrete kerb, with the paver behind them

    5Surface, laid.

    Asphalt and kerb

    Asphalt laid and compacted against new concrete kerb and channel, for roads, car parks and commercial sites.

    See the surface work

    Laying asphalt against a new kerb. Image created from a Prime job photograph.

  6. A newly finished asphalt road running straight between new concrete kerbs, empty and ready to use

    6Job, handed over.

    Handover

    The site is cleaned up and handed back finished, with one point of contact from the first visit to the last.

    Start your project

    A finished road, ready to hand over. Image created from a Prime job photograph.

Patrick Messina, arms folded, in a charcoal work jacket

Founder and Managing Director

One team for the whole job, led by Patrick.

Patrick founded Prime Building Solutions and runs it as a complete solution from start to finish. He has about 18 years in construction himself, including three companies before Prime. His team takes on concreting, asphalting, demolition and insurance work, and the project management that ties them together.

About Prime Call Patrick on 0437 861 684

Patrick crouched at the timber edge formwork, checking the steel mesh on its bar chairs during a concrete pour

Concreting and concrete pumping

  1. Concrete pump Accurate, efficient concrete placement for complex or large pours.
  2. Placing crew The crew spreads the concrete and levels it to the height the formwork sets.
  3. Edge formwork Boards that set the slab’s edge and height.
  4. Reinforcement Steel mesh lifted on bar chairs to sit inside the concrete.
  5. Concreting Slabs, footings and footpaths, placed accurately and finished properly.

Concrete and structures

On the pour. Portrait images on this page are created from a photograph of Patrick.
Ground floor plan of a two-storey residence, cut from the Revit model, with the recessed entry traced in gold
The same residence as a model rising from its plan: walls, stair and roof in place The residence model from the street with its finishes applied: limewashed brick, a single-storey garage and a steel entry canopy
Visualisation of the finished residence from the street: a two-storey limewashed house, a single-storey garage and a recessed entry under a steel canopy

Featured design · Limewash House

From the drawing to the finished house.

One house, followed from its Revit plan through structure and materials to a finished visualisation. Keep scrolling.

Limewash House · 01 Drawing

Ground floor plan, cut from the Revit model. The recessed entry is traced in gold.

Limewash House · 02 Structure

The same model lifts off the plan: floors, walls, stair and roof where they are modelled.

Limewash House · 03 Materials

Limewashed brick throughout, and a dark steel entry canopy lined in timber battens.

Limewash House · 04 Final design

Visualised from the same camera. Design stage: not a photograph of built work.

Explore the project
Close view of the entry: a dark steel canopy with a timber-batten soffit along the limewashed garage wall
The entry junction: steel canopy, timber-batten soffit, limewashed brick. Visualisation from the Revit model.

Limewash House · design stage

One threshold, settled before work starts.

The recessed entry is the part of this design everything else answers to: a steel canopy along the garage wall, a timber-batten soffit, and a pivot door set back from the street. Resolving it in the model means the junctions are decided on screen, not on site.

Explore the project

The black brick house from the air, the first frame of its house film

Featured design · Black Brick House

Walk through the house before it is built.

A design to rework a two-storey brick home inside and out, seen finished in the model. Keep scrolling to repaint it.

Six schemes, one facade

Repaint the house before a brush touches it.

The front of the house in the all-black scheme at midday: black brick, a black portico, palms and a paved forecourt

01All black, midday

From model to photograph

The model first. Then the photograph.

Every view starts as a camera in the 3D model of the house. The photoreal frame is made from that view and checked against it, so the walls, openings and roof lines are the model’s, not invented. Drag across to compare.

Photoreal view of the front: a two-storey black brick house, a single-storey garage, palms and a paved forecourtThe same front view in the Unreal Engine model
The street front. Model on the left, photoreal on the right.
Photoreal view of the rear: the two-storey bay, the pool behind a glass fence and the lawnThe same rear view in the Unreal Engine model
The rear and the pool, from the same camera in both.
Photoreal aerial view over the house, the forecourt and the neighbouring roofsThe same aerial view in the Unreal Engine model
From the air. Neighbouring houses and trees are illustrative.

Pool, garden and rooms

Every angle, from the model.

The pool from the air, the first floor, the cabana and the water line, then the rooms inside. Each frame was made from a camera in the model. Finishes vary between the options studied.

  • The pool from first-floor height: pale travertine paving, white loungers, a glass fence and the lawn beyond
    Pool: travertine paving, loungers and a frameless glass fence.
  • The rear of the black brick house at dusk, rooms lit, wall lights on, two loungers beside the lit pool
    Dusk at the rear, the pool lit.
  • View back to the house from under the cabana roof, past a daybed to the pool and lawn
    From the cabana, back across the pool to the house.
  • Water-level view along a long narrow pool towards loungers and a black batten fence
    At water level: a mosaic-lined step and a long, narrow pool.
  • Aerial view over the dark tiled roof to the pool, terrace and lawn in the rear yard
    From above: the rear yard, set out from the model.
  • Kitchen with a marble waterfall island, three bar stools, oak joinery and a lit marble splashback
    Kitchen: the waterfall island. Interiors shown are the first concept.
  • Living room with a marble fire wall, a linear fireplace, an arched niche and a round coffee table
    Living: the marble fire wall.
  • A concealed door in a fluted oak wall, open to a butler’s kitchen with built-in ovens
    The concealed door to the butler’s kitchen.
  • Entry hall looking to a floating stair with lit treads and a glass balustrade
    Entry and the floating stair.
  • Main bedroom with a marble feature wall, an upholstered bed and sheer curtains to balcony doors
    Main bedroom.
  • Ensuite with book-matched marble walls, a freestanding bath and an arched mirror
    Main ensuite.
  • Looking down the stair void from upstairs, past a cluster of glass pendant lights
    Upstairs: the stair void.

Black Brick House is a design, not yet built, shown with the owners’ permission. Sky, planting, furniture and neighbouring houses are illustrative. Address withheld.

A Prime crew laying and rolling new asphalt around a curved concrete kerb in a Melbourne street
On site: a Prime crew laying asphalt around a new kerb.

Prime on social

Follow the work, as it happens.

Prime’s social channels and reviews are being set up. Until they are live, this wall shows the work they will carry.

  • Coming soon
  • Instagram coming soon
  • Facebook coming soon
  • LinkedIn coming soon
  • YouTube coming soon
  • Google reviews coming soon

Everything on this wall is Prime’s own. Pictures marked “straight from Patrick’s phone” are his own site photos, cropped, straightened and sharpened only, with faces, signs and number plates blurred. Other job pictures are images created from Prime job photographs, factory pictures are created from stills of Prime’s project film, portraits are created from a photograph of Patrick, and the houses are design visualisations, not built work. Prime’s social accounts and review page are not live yet: anything marked “coming soon” is a placeholder, not a post or a review.

Start a conversation

Tell Patrick about your project.

Three minutes on the project brief gives Patrick what he needs to come back to you about scope, timing and next steps.

Start your project Or send a quick message

0437 861 684[email protected]

1,000+ builds delivered★★★★★ 4.87 average star rating

Prime Building Solutions
Start your project